Loading...

"Record"

Sierra Leone - Second Power Project

Claessens,Constantijn A. Diwan, Ishac Guinea, Liberia, Sierra Leone (AFC16) [Corporate Author]

Access the full text:

Abstract
The bank's project, estimated to cost about $4.8 million, would consist of the installation of one 6.6 MW diesel electric generator at the King Tom power station and the expansion of the distribution system in Freetown; the installation of three 1000 KW diesel electric generators and the expansion of the distribution system in the town of Kenema; and the installation of two 1000 KW diesel electric generators and the expansion of the distribution system in the town of Koidu.
Loading...

Other subjects

  • Electric Power
  • Energy
  • Law and Justice
  • Corporate Law