Repairing method of old fill dam embankment using cement-mixed muddy soil
2005
Tani, S.(National Inst. for Rural Engineering, Tsukuba, Ibaraki (Japan)) | Fukushima, S. | Kitajima, A. | Hirota, O. | Nishimoto, K.
Most of irrigation reservoir dams were mostly accumulated with a mud soil in reservoir that caused the pollution and the shortage of reserved water. This mud soil generally is high-water-content and very soft clayey soil. In order to make efficient use of such a problematic soil as embankment soil, we have developed a new type method to repair the embankment of irrigation pond by means of the stabilized mud soil with cement stabilizer This paper investigates geotechnical problems when applying this method to repair the embankment of the fill dam having the embankment more than 1 5m high.
اظهر المزيد [+] اقل [-]