Combinations of Horizontal and Vertical Flow Constructed Wetlands to Improve Nitrogen Removal
2009
Gaboutloeloe, Gilbert Kabelo | Chen, Shulin | Barber, Michael E | Stockle, Claudio O.
Nitrogen removal in wetlands is achieved through two pathways: (a) N cycling and (b) storage. N cycling is a permanent removal pathway. There has been an increasing interest in the development of technologies to alleviate permanent nitrogen removal limitation in constructed wetlands by ensuring prevalence of conditions enhancing N cycling. The purpose of this study is to review an emerging technology of vegetated submerged bed constructed wetland system aimed at improving nitrogen removal in wetlands through rational system design. The design and performance of this system type is evaluated. The oxygen transfer capacity and nitrogen removal mechanisms on system performance are evaluated. Constructed wetland combinations most commonly consist of vertical flow (VF) and horizontal flow (HF) beds where VF and HF are aimed at nitrification and denitrification, respectively. Nitrate nitrogen accumulation is the most limiting factor in typical VF based systems.
اظهر المزيد [+] اقل [-]الكلمات المفتاحية الخاصة بالمكنز الزراعي (أجروفوك)
المعلومات البيبليوغرافية
تم تزويد هذا السجل من قبل National Agricultural Library