Philippines - Second Manila Water Supply Project
Heggie, Ian G.
The proposed project will provide safe water for an additional 4 million people in Metropolitan Manila, as well as improve the service to some 3 million who are inadequately served at present. It is estimated that, by 1987, some 3.3 million of the 4.6 million urban poor would have reasonable access to safe water as a result of the project. An additional 10,000 jobs for 30 months would be provided during project construction. The major risk associated with this project relates to the ability of MWSS to improve its capacity to construct and operate a much larger water supply system. This risk would be minimized by the substantial provision in the project for technical assistance and training and by the proposed reorganization of MWSS with branch offices for operation and maintenance. Close supervision ofthe project will be required.
Show more [+] Less [-]AGROVOC Keywords
Bibliographic information
This bibliographic record has been provided by World Bank