Lead and zinc : postwar problems and future prospects
Johnson, Simon | Zoido-Lobaton, Pablo | Kaufmann, Daniel
The proposed project consists of: (i) drilling of about 910 new wells for air injection and oil production; (ii) construction of 24 oil and gas separation centers nine of which will be equipped with water injection facilities; (iii) construction of a central oil treatment, storage and pumping facility similar to the existing facility which will also be expanded; (iv) construction of a treatment facility for water reinjected into the reservoir; (v) construction of air injection facilities comprising five compressor stations; (vi) laying of approximately 1,300 km of pipelines and flow lines for air and water injection, gas supply and fluid collection and disposal; (vii) construction of power substations and distribution lines, and treated water and steam supply facilities; (viii) construction of about 50 km of main and 70 km of access roads and field offices and laboratories; (ix) laboratory and field monitoring instruments; and (x) engineering and technical services.
Show more [+] Less [-]AGROVOC Keywords
Bibliographic information
This bibliographic record has been provided by World Bank