Affiner votre recherche
Résultats 1-3 de 3
Torrent rainfalls at four Beskidian climatic stations and their evaluation
1999
Chlebek, A | Jarabac, M. (Vyzkumny Ustav Lesniho Hospodarstvi a Myslivosti, Jiloviste-Strnady (Czech Republic)) | Tolasz, R. | Zidek, D.
Torrents in the air polluted area of Beskids
1999
Jarabac, M. (Vyzkumny Ustav Lesniho Hospodarstvi a Myslivosti, Jiloviste-Strnady (Czech Republic) | Gasek, V.
Protection system of high groundwater levels in the coastal area of the Danube in the Djerdap 1 HPP reservoir [Serbia] | Системи заштите од високих нивоа подземних вода приобаља Дунава у зони акумулације ХЕ Ђердап 1 [Србија]
2012
Радосављевић, П., ПД Хидроелектрана Ђердап д.о.о., Београд (Serbia) | Никић, З., Шумарски факултет, Београд (Serbia)
The Djerdap 1 Hydropower Plant (Djerdap 1 HPP) was joint projects of Yugoslavia and Romania, based upon the principles of equal benefits. The primary functions of the Djerdap 1 HPP are to effectively utilize the available hydropower potential of the Danube and to provide a full navigational capability under any hydrologic conditions. The utilization of the hydropower potential was conditional upon the provision of a Riparian Land Protection System for the Djerdap 1 reservoir, and the timely prevention of any adverse impacts due to the alternation of the natural regime as a result of backwater. ongoing enhancement of the Riparian Land Protection System and study of the various impacts have enabled a continual backwater increase and a resulting increase in the output of high quality power, with no significant risk of adverse impacts.
Afficher plus [+] Moins [-]