Estimation of rock drilling work size for mountain forest road construction
1987
Ma, S.K. (Forest Work Training Center, Gangneung (Korea R.))
Simple estimating method of rock drilling and blasting work size is necessary to apply as a guidance of general road plan and a cost analysis of mountain forest road construction. For this work study, 11 cycles were divided in 5km route at Hyeonnammeon Yangyang-gun and the mountain slope at every 20 m interval was measured. During working days all kind of works concerned on drilling and blasting was investigated in every cycle. Depending on the simple work study results, work size can be estimated with high correlation between drilling length in meter and frequency percentage of mountain slope more than 70%. With total drilling length known the machinery hours, drillers and explosive quantity can be estimated by the regression with high correlation. Estimation of drilling and blasting work by mountain slope gradient in road route is proposed like table 5 with estimating value of machinery hour, drillers and explosive in granite gneiss region
Показать больше [+] Меньше [-]Ключевые слова АГРОВОК
Библиографическая информация
Эту запись предоставил Korea Agricultural Science Digital Library