Reconstruction of dam according to reservoir operation analyses | Rekonstrukcija brane na osnovu vodoprivredne analize
2009
Marinkovic, N., IK Consulting Engineers Ltd. Beograd (Serbia)
Reconstruction of Banjani Dam (near Gornji Milanovac, Serbia) is foreseen according to present condition of dam and appurtenant structures as well as insufficient volume of its reservoir, which is used only for flood retention. The reconstruction of dam comprises the increasing of its height, construction of dam according to hydraulic and structural design criteria and multipurpose utilities of reservoir. The reservoir volume will be used for sedimentation, releases for public water supply, environmental guarantee discharges and flood control. The researvoir operation analyses are performed based on deficient available data in order to determine the most realistic preliminary main characteristics of dam, appurtenant structures and reservoir. According to proposed characteristics the Site investigation programme and Planning Report will be prepared.
显示更多 [+] 显示较少 [-]