AGRIS - 国际农业科技情报系统

The National Shipbuilding Research Program Product Work Breakdown Structure

2006

Olayama, Y. | Chirillo, L. D.


书目信息
其它主题
Group technology; Statistical processes; Administration and management; Ship hulls; Industrial procurement; *product work breakdown; Marine engineering; *production control; Manhours; *shipbuilding; Cost estimates; Work packages; *management planning and control; Zone painting method; Subassemblies; Parts; Work subdivisions; Zone outfitting method; *work elements; *mass production; Scheduling; *pipes; Critical assemblies; Line heating; Pwbs(product work breakdown structure)
语言
英语
许可
http://handle.dtic.mil/100.2/ADA452008Approved for public release; distribution is unlimited.
来源
MARITIME ADMINISTRATION WASHINGTON DCDTIC
团体作者
MARITIME ADMINISTRATION WASHINGTON DC

2013-06-15
AGRIS AP
在Google Scholar上查找
如果您发现与此记录相关的任何错误信息,请联系 [email protected]