Great Lakes and St. Lawrence Seaway Navigation Season Extension. Volume 6. Appendixes H - L
1979
This final report evaluates six proposals, considering various season lengths and geographic coverages, to further extend the navigation season on the entire Great Lakes/St. Lawrence Seaway System up to 12 months on the upper four Great Lakes, and up to 11 months on the Welland Canal, Lake Ontario and the International Section of the St. Lawrence River. This report relates U. S. costs to U. S. Benefits.
显示更多 [+] 显示较少 [-]AGROVOC关键词
书目信息
其它主题
Lake saint clair; Demonstrations; Detroit river; Saint clair river; *inland waterways; *great lakes; Marine engineering; Limnology and potamology; Saint lawrence seaway; Saint marys river(michigan); Water traffic; *surface navigation; Seasonal variations
语言
英语
注释
See also Volume 1, ADA084203.
许可
http://stinet.dtic.mil/oai/oai?&verb=getRecord&metadataPrefix=html&identifier=ADA084208Approved for public release; distribution is unlimited.
类型
Text
来源
CORPS OF ENGINEERS DETROIT MI DETROIT DISTRICTDTIC AND NTIS
团体作者
CORPS OF ENGINEERS DETROIT MI DETROIT DISTRICT
2013-06-15
AGRIS AP