Marine Seismic System Deployment (MSS). Phase 2. Investigation of Techniques and Deployment Scenarios for Installation of Triaxial Seismometer in a Borehole in the Deep Ocean
1981
Wallerstedt, Robert L
This report presents the results of the Phase II detail design and planning effort oriented primarily toward the initial Marine Seismic System (MSS) At-Sea-Test scheduled for March 1981. The At-Sea-Test operations will be conducted using the Deep Sea Drilling Project (DSDP) drillship GLOMAR CHALLENGER for an estimated period of six days. The overall MSS deployment program plan and associated costs est. has been upgraded to reflect the emplacement of two boreholes, and the deployment of one configuration I BIP system in the North Pacific during the period of June-July 1982.