Geohydrodynamic investigations relating to Kruonis PSHP
1997
Ramonas, C. (Lithuanian University of Agriculture, Kaunas (Lithuania). Dept. of Building Constructions) | Ruplys, B.
Kruonis (till 1992 - Kaisiadorys) pumped storage hydroelectric plant (PSHP) was provided to cover great irregularities of electricity consumption in the north-western part of the former USSR. Kruonis PSHP had to be one of the greatest in Europe. Designed capacity had to be 1600 MW, acting head approximately 110 m. Due to geohydrodynamic investigations denied one of main arguments against PSHP, helped to evaluate a seepage from the upper basin of Kruonis PSHP.
显示更多 [+] 显示较少 [-]AGROVOC关键词
书目信息
出版者
LUA
页码
p. 32-36
其它主题
Energie electrique; Energia electrica; Investigacion
语言
英语
注释
Summaries (En, Lv)
1 ill., 4 ref.
翻译的标题
Kruonis hidroakumulacijas (HAES) elektrostacijas geohidrodinamiskie petijumi
类型
Summary; Conference; Non-Conventional
来源
[Research Practical Conference "Rural Environment '97". Pt.1: Rural Engineering and Building], Latvian University of Agriculture, Jelgava (Latvia). Faculty of Rural Engineering.- Jelgava (Latvia): LUA, 1997. 81 p.
粮农组织大会
Lauku vide '97, Jelgava (Latvia), 13-14 Mar 1997
1998-08-15
AGRIS AP